Hold the budget,line by line.

Live budgets with committed, actual, and forecast costs — every dollar traceable to a commitment.

JB
Budgets · Cedar Heights
Budgets · trailing 8 periods

A budget is only true if it moves with the job. ErectOS holds the budget as a live ledger original, committed, actual, and forecast on every line so the number you report to the owner is the number the field is actually spending, today.

Committed, not guessed

Every commitment ties to a budget line, so what you have spent and what is left is always exact.

Forecast that moves

Cost-to-complete updates from field production and approved changes — no stale month-end snapshot.

Powered by Pulse

Pulse flags the line headed for an overrun while there is still time to do something about it.

Build the budget from the estimate.

Carry the winning estimate straight into the budget, structured by cost code, with original values locked and every change tracked against them.

1.0 Build

JB
Budget · Cedar Heights
Budgets · trailing 8 periods
Variance alert

Div 23 is trending 4.2% over committed.

Budget$2.4M
Committed$2.31M
Forecast$2.50M
1.1
Estimate carryoverThe awarded estimate becomes the original budget.
1.2
Cost-code structureEvery line maps to your standard cost codes.
1.3
Locked originalBaseline values are locked; changes are tracked.
1.4
Contingency trackingDraws against contingency are visible and approved.

See the overrun before it lands.

Committed, actual, and forecast roll up live across the job. Drill into any line to see the commitments and invoices behind the number.

2.0 Control

JB
Budget · variance
Budgets · trailing 8 periods
ErectOS Pulse

Pulse forecasts a $96k overrun on mechanical.

Driven by approved CO-014 and current production rates.

Open lineDismiss
2.1
Committed vs actualWhat you owe and what you have paid, by line.
2.2
Live forecastCost-to-complete that moves with the field.
2.3
Drill-downEvery number traces to its commitments and invoices.
2.4
Owner reportingBoard-ready cost reports in one click.

Wired to the whole build

Budgets reads from and writes to every module it touches — your data is entered once and trusted everywhere.

CommitmentsCommitments → Budget

Every subcontract and PO posts against its budget line automatically.

Change OrdersCOs → Budget

Approved changes adjust the budget — never quietly absorbed.

InvoicesInvoices → Budget

Approved costs become actuals the moment they are paid.

ForecastingBudget → Forecast

Live budget data drives the cost-at-completion forecast.

Every dollar traces to a commitment you signed.

Commitments → Budgets

The overrun shows up while you can still fix it.

Budgets → Pulse

The number you report is the number the field is spending.

Field → Budgets

The budget is the promise.Run it in ErectOS.